Waferpedia

Comparison ledger

0010-13622 RF Match forversus4400

Applied Materials 0010-13622 RF Match for, Perkin Elmer 4400, side by side. Every value shown is drawn from the cited encyclopedia entries.

Side-by-side comparison of selected equipment models
Attribute
0010-13622 RF Match forApplied Materials
4400Perkin Elmer
OEMApplied MaterialsPerkin Elmer
CategoryDepositionDeposition
Wafer size——
Process node——
Introduced——
Production run——
Lifecycle——
Lifecycle milestones——
Control system——
Generation——
FamilyApplied Materials 0010-13622 RF Match forPerkin Elmer 44xx
Specifications
ConfigurationHigh Efficiency HE RF Match-Bias[1]Pump Exhaust GEEX[2]
Model0010-13622[1]—
Product TypeRF Match for PVD (Physical Vapor Deposition)[1]—
FeatureHigh Efficiency HE RF Match-Bias[1]—
Handler Type—Manual[2]
CDA—60-80 psi[2]
Chilled Water—68 F, 2 gpm[2]
N2—50 psi[2]
HPN2—60 psi[2]
HPAr—10 psi[2]
O2—10 psi[2]
Power—208 V, 3 Phase, 60 A[2]
Process Type—Sputtering / Physical Vapor Deposition[4]
Wafer Size—6 inch[5]
Sputtering Types—DC, RF, DC-RF bias capable[3]
Target Positions—Ports for four targets; three utilized (two DC with RF bias, one RF)[3]
Load Lock—Yes[3]
RF Etch Option—Yes[3]
Pump - Main Chamber—Cryotorr 8 cryopump with CTI SC (air-cooled) He compressor[3]
Pump - Load Lock—Pfeiffer turbopump backed by Trivac rotary vane pump[3]
Roughing Pump—Ebara A10 roots pump[3]
Power Supply—Present[2]
AC Distribution Box—Present[2]
Heat Exchanger / Chiller—Present[2]
Backing Pump—Present[2]
Cryo Compressor—Present[2]
Mechanical Pump—Present[2]
CDA Supply—60-80 psi[2]
Chilled Water Supply—68 F, 2 gpm[2]
N2 Supply—50 psi[2]
HPN2 Supply—60 psi[2]
HPAr Supply—10 psi[2]
O2 Supply—10 psi[2]
Power Requirement—208 V, 3 Phase, 60 A[2]
Pump Exhaust—GEEX[2]
GEM / SECS—Present[2]
Cables—All cables present[2]
Standard Manual—Included[2]
CE Mark—No[2]
Vintage—2004[2]
Equipment type—Sputtering system[4]
Target ports—Four target ports[3]
Process modes—DC and RF, with DC-RF bias capable[3]
Options—RF etch option[3]
Load lock—Load lock[3]

Plan your fab

Building a Deposition process? Get a complete equipment list.

Open the fab equipment planner →
Sources (5)Every fact above is drawn from these public sources
  1. [1]inventory listing
  2. [2]inventory listing
  3. [3]inventory listing
  4. [4]Equipment inventory listing
  5. [5]Equipment inventory listing